Set up your budget

How to set up your project budget

Written By Mirell

Last updated 9 days ago

The quickest way to set up a project budget is to import it from a spreadsheet. Pick the template that matches your project, fill it in and upload it.

Good to know: Planyard can only import an Excel budget that uses the Planyard template! Is your budget in a different format? Reach out to the Planyard team. Our AI converter (in beta) can turn any budget into the Planyard format.

Before you start: plan your budget structure

How you structure your budget decides how easily you can track costs, commitments and CVRs, and how much you learn for the next project. Keep these points in mind:

  • Use your own structure. There are no predefined cost codes. Add as many headings and subheadings as you need, and Planyard rolls up the totals automatically.

  • Follow the project timeline. Order your cost headings the way the work happens (for example Demolition, Structural changes, Electrical). You can then track each package against its own scope of works.

  • Avoid overly generic items. Items like Labour, Plant or Materials only tell you that a category ran over, not where or in which contract.

  • Keep cost items consistent across projects. Planyard saves historic cost data per item, so using the same items builds data you can benchmark against and use to estimate more accurately.

  • Plan for income too. Income is always tied to budget items. Decide whether costs and income share the same items, sit as separate items under one heading, or go in separate sections.

Read the full budget structure guide or watch the video.

Create your project

You need permission to create, edit and archive projects. If you don't have it, contact your company account owner.

  1. Click Projects in the top menu.

  2. Click Create Project in the top-right corner. For your first project, click Create custom project in the centre of the screen.

  3. Fill in the project details:

    • Project name (required)

    • Currency (required): used for all budgeting and cost tracking

    • Project code (required): used to generate reference numbers

    • Project address (optional): the default delivery address

    • Project dates (optional)

    • Project template (optional): a predefined budget structure, if you have one

  4. Click Create Project.

You'll land on the Budget tab, where you can add your budget using one of the options below.

Option 1: Import a simple budget

Use this template for a quick start when your budget has one level of categories and line items.

  1. Download the simple budget template.

  2. Fill in your categories, line items and amounts.

  3. Import the file into your project.

New to importing? Watch the 2-minute guide.

Option 2: Import a complex budget

Use this sample for larger projects that need several subcategory levels or more than one budget version.

  1. Download the complex budget sample.

  2. Build your structure with as many subcategory levels as you need, and add your budget versions.

  3. Import the file into your project.

See how it works in the 3-minute guide.

Fill in and upload your spreadsheet (Options 1 and 2)

You can also get the template from the Budget tab: click Download template file. The template supports categories, subcategories and line items, and Planyard calculates all totals once it's imported.

Column

Name

What to enter

A

Category level

1 for a main category, 2 for a subcategory, 3+ for deeper levels. Leave blank for line items.

B

Cost code

Optional. For internal tracking or grouping.

C

Line item

Required. The name of the category or line item.

D

Unit

Optional. Free text, e.g. m or pcs. Not needed for categories.

E–G

Net estimated cost

Quantity, unit price and total. Total is required if you don't use quantity and unit price; with only a total, Planyard assumes a quantity of 1.

H–J

Budget submitted to client

Optional. Quantity, unit price and total.

K–M

Target budget

Optional. Quantity, unit price and total.

N

Comment

Optional.

Keep in mind:

  • Don't delete any columns, even the ones you leave blank.

  • Line items must come after a category or subcategory.

  • Formulas are fine: Planyard reads the final value in each cell.

  • Columns after N are ignored, so you can use them for notes or your own calculations.

To upload: go to the project's Budget tab and click Browse Files, or drag and drop the file into the upload area. Planyard creates your full budget structure, ready for tracking, forecasting and cost control.

Option 3: Build it from your Planyard cost codes

Use this option to build the budget from the cost codes already set up in your Planyard account, without a spreadsheet.

  1. Create an estimate in the cost estimating tool, using your cost codes.

  2. Convert the estimate into a project budget.

See how cost estimating works.